The finding is reported the same day with its location, measured temperature, the difference in °C from a matching reference and the load at the time. That lets the site plan the investigation into its next maintenance window. Until then the site’s own engineers decide any interim measures, and a repeat image of the same connection at similar load shows whether it is changing.