Should neutral connections be checked in a data centre thermography survey?

Yes. In a real installation the neutral carries current, so its terminations can run warm just like the phase connections. A data centre survey should image the neutral bar and neutral terminations on every board that is opened, record the load on the neutral where it can be measured safely, and report neutral readings alongside the phases.

Why the neutral gets missed

Surveys tend to focus on the three phases because that is where the protective devices are. The neutral bar often sits low in the panel, behind cables, or in a separate compartment. If nobody asks for it, it can drop out of the scope without anyone deciding to leave it out.

Phases on a live site are rarely perfectly balanced, and data halls are full of IT power supplies. Neutral current is normal. That is why it should be imaged and measured rather than assumed.

Where neutrals are imaged in a data centre

  • LV main switchboard neutral bars and incoming neutral terminations
  • UPS input and output neutral terminations
  • Floor PDU and remote power panel neutral bars
  • Busbar tap-off units, where the neutral connection can be viewed. See overhead busbar in a live data hall.
  • Rack PDU inputs and their supply connections where accessible. See rack PDUs in a live data hall.

Covers are opened by the site’s authorised electrician under its permit to work. Nothing is switched off. See who opens the panels.

Recording the load on the neutral

A temperature reading means little without the load behind it. Where the neutral current can be measured safely, it is recorded with the image, the same as the phase currents. That gives the reader the full picture for each board, and lets next year’s survey be compared fairly. See what load a survey needs.

What the report shows

Each neutral reading is reported the same way as a phase reading: where it was taken, the measured temperature, the reference it is compared with, the difference in °C, and the load at the time. The report says what was measured. It does not say why a connection is warm; that is for the site’s electrical team to investigate.

Traps to avoid

Neutral bars are often bare, bright copper or tinned metal. Shiny metal reflects heat from its surroundings, so a reading taken straight off the bar can be wrong in either direction. A thermographer takes the reading from a surface that gives a true value, such as a cable lug, an insulated section or a cable just beyond the termination, and notes where it was taken.

Proof from our own work

Checking every connection under real load is how we work on every site. On a London data centre build, commissioning thermography by our team found 16 busbar sections reading above 80 °C under test load, the highest 103.5 °C at a tap-off unit, each one located and imaged.

Ti inspects and reports. Any finding is investigated and put right by the site’s electrical team or contractor.

Frequently asked questions

Does a balanced load mean the neutral carries nothing?

Not on a real site. Phases are rarely perfectly balanced, and IT loads add neutral current, so the neutral is imaged and its load recorded.

Should the neutral be in the scope at commissioning too?

Yes. A commissioning baseline that includes neutrals gives the annual survey something to compare against.

How often should neutrals be checked?

As part of every annual survey, on every board opened. See annual PPM thermography.

Related reading

Ti Thermal Imaging’s surveys are carried out by ITC Level 3 thermographers, and Ti is a Level 3 certified company. Our work has featured on BBC News and ITV.

Talk to us: +44 20 3885 7464 · sales@thermalimaging.co.uk · contact page

About the author: Rachael Browning, General Manager, Ti Thermal Imaging.