Short answer: yes, but scope it properly. The battery isolators, DC fuse and breaker panels and the cabling to the UPS should be in every survey. The cells and inter-cell links themselves carry very little current on float charge, so a loose link may not show; they are best imaged during a planned discharge or UPS load test, agreed with your battery maintainer. Thermography sits alongside impedance testing, not in place of it.
Why batteries are different from the rest of the power path
A poor connection shows on camera by the heat it gives off when current flows through it. Switchgear, UPS modules and PDUs carry the IT load all the time, so they can be surveyed on any normal day. A battery string on float charge is different: it carries only a small charging current, which is often too little to warm a weak bolted link enough to see. The same string under discharge carries the full UPS load, and that is when a high-resistance connection shows.
What should be in scope on a normal survey day
- Battery circuit breakers and isolators between the strings and the UPS.
- DC fuse and distribution panels, including any battery monitoring supplies.
- Cable terminations at the UPS DC input and at the battery cabinet or rack ends, where they can be seen safely.
- Battery room ventilation and cooling panels, which keep the room within the temperature the batteries are designed for.
- A visual sweep of the strings to note anything unusual, recorded with the float current at the time, and treated as a baseline rather than a clean bill of health.
When to image the cells and links
The useful window is a planned discharge or autonomy test, or a UPS load bank test, when the strings are actually delivering current. The battery maintainer runs the test; the thermographer images the strings while it runs, working cell to cell along each string so every link is compared with its neighbours on the same current. Readings are logged with the discharge current and time into the test. Ti reports the measured temperature and the difference in °C from matching links, with the location by string, tier and cell number. It does not diagnose the cause from an image; the maintainer decides what to check or replace.
Traps a good thermographer avoids
- Shiny terminals and busbars reflect heat from elsewhere in the room, so readings are taken from surfaces that give a true value, or from a second angle.
- Cell temperature varies with position: cells at the top of a rack or near a cooling outlet can sit at different temperatures for reasons that have nothing to do with a fault. Like is compared with like.
- Closed lithium-ion cabinets are not opened for imaging unless the manufacturer and maintainer allow it; their own monitoring system is the primary check.
- Battery room safety: the survey follows the site’s battery room rules for access, PPE and ventilation.
Why it matters
The batteries only matter when the mains fails, which is exactly when nobody wants to find a weak link. On a London data centre build, commissioning thermography by our team found 16 busbar sections reading above 80 °C under test load, the highest 103.5 °C at a tap-off unit. They showed because the system was carrying load when it was imaged. Batteries follow the same rule: survey them when they are carrying current.
What you get
A report issued the same day, with a thermal and visual image for every finding, located by your own UPS, string and panel names, the load or discharge current at the time, and a list of anything that could not be accessed. Surveys are carried out live, with no downtime, by ITC Level 3 thermographers, and Ti is a Level 3 certified company.
Frequently asked questions
Does thermography replace battery impedance or conductance testing?
No. Impedance testing looks at each cell’s internal condition; thermography looks at the heat from connections under load. They answer different questions.
Do we need to run a discharge test just for the survey?
Not usually. Most sites already run one as part of battery maintenance. Book the survey for the same day.
Can the battery panels be surveyed on our normal annual visit?
Yes. Breakers, isolators, DC panels and terminations go into the annual live survey with the rest of the UPS system.
Related reading
- UPS and switchgear surveyed live, no shutdown
- Busbar thermography at data centre commissioning
- How much load does a survey need?
- Data centre electrical thermography
- Switchgear thermography
- Annual PPM thermography
- 7 electrical risks behind downtime
Talk to us: +44 20 3885 7464 · sales@thermalimaging.co.uk · send us your site details
About the author: Rachael Browning is General Manager of Ti Thermal Imaging, which carries out electrical thermography for data centres, FM portfolios and industrial sites across the UK and UAE. Ti’s work has featured on BBC News and ITV.