Yes. Replacing a UPS, a switchboard section or a breaker means new terminations, and often reconnected cables upstream and downstream, made in a live or recently live site. None of them has yet been proven under normal load. A thermography survey once the new equipment carries its normal load checks every connection the work created or disturbed, against the last survey.